Oil and gas platform

BP Turkey — 1,600 P&ID drawings in four months

Redline mark-ups from a live pipework survey, turned around week after week.

ODL, part of the Wood Group, sent a team of engineers to Turkey to survey the pipework for end client BP and redline-markup the existing drawings. Those mark-ups needed to be turned into accurate, updated .dwg files reliably — week after week — to keep the survey programme moving.

Each week ODL issued the redlined mark-ups to Outsource CAD. We updated the drawings and returned the completed .dwg files the following week, to an agreed schedule, working across both MicroStation and AutoCAD to match the client's environment.

Every updated drawing was checked by our in-house QC engineer before being issued back to the client, keeping the standard consistent across all 1,600 drawings.

  • 1,600 P&D layout drawings updated from client redlines in approximately four months.
  • Delivered on a dependable weekly cycle that kept pace with the live survey.
  • Worked seamlessly across MicroStation and AutoCAD.
  • Every drawing QC'd in-house before issue.
Oil & Gas
Redline mark-ups / P&ID updates